3x3 Curved Fabric Tube Exhibition Stand – S-Curve Vision
3x3 Curved Fabric Tube Exhibition Stand – S-Curve Vision
- Wrinkle-Resistant Fabric
- Tool-Free Setup
- Delivery Australia-wide
Couldn't load pickup availability
3m x 3m fabric tube exhibition stand with a 2m backdrop, 1m S-curve tower with TV mount, podium counter and small side table.
Compare all 3x3 fabric exhibition stands
Want it lit? Shop Backlit Exhibition Kits
Add height: Shop Backlit Fabric Towers

Collapsible content
Overview
Create an Interactive Exhibition Experience
The 3x3 Fabric Tube Exhibition Stand – S-Curve Vision combines curved and flat tension fabric walls to create a modern, flowing backdrop that attracts attention on a busy exhibition floor.
The curved tower section provides a natural focal point for your brand, with an integrated mounting area for a TV display to showcase product videos, presentations, demonstrations or promotional content. This makes the S-Curve Vision ideal for businesses wanting to combine strong visual branding with digital engagement.
The included podium counter provides a professional front-of-booth reception area for welcoming visitors, displaying brochures or starting conversations with potential customers.
Perfect For
- Product Demonstrations
- Technology Displays
- Corporate Presentations
- Trade Shows
- Exhibitions
- Brand Launches
- Retail Promotions
- Media Events
What's Included
- 1 × Fabric Tube Display Wall Frame
- 1 × Curved Fabric Tube Display Tower
- 1 × TV Mount (holds up to 30 inch TV, TV not included)
- 2 × Premium Single-Sided Tension Fabric Graphics
- 1 × Podium Counter with Custom Graphic Wrap
- 1 × Display Shelf
- Carry Bags
- The podium counter converts into a durable transport case, allowing all display components to be packed neatly inside for easy storage and transportation.
Optional Upgrades
- Double-Sided Fabric Graphics
- Standard Spotlight Kit (Pair of LED Spotlights)
Why Choose S-Curve Vision?
- Unique curved tower design creates a premium booth appearance
- Integrated TV display area for videos and presentations
- Combines branding with digital engagement
- Lightweight aluminium snap-tube frame
- Tool-free setup in approximately 15–20 minutes
- Premium tension fabric graphics with smooth finish
- Reusable frame with replaceable graphics
- Portable design for repeated exhibitions
- Ideal for businesses promoting products, services and brands
FAQ
What's included in the S-Curve Fabric Tube Exhibition Stand?
The package includes:
- 1 × Flat Aluminium Snap-Tube Display Wall (2000mm W × 2286/2540mm H) with Single-Sided Tension Fabric Graphic
- 1 × Curved Aluminium Snap-Tube Display Wall with Integrated TV Frame (1000mm W × 2540mm H) and Single-Sided Tension Fabric Graphic
- 1 × TV Mount (supports TVs up to 30")
- 1 × Podium Counter with Aluminium Snap-Tube Frame and Custom Fabric Graphic (600mm W × 1000mm H × 400mm D)
- 1 × Small Side Table (supports up to 5kg)
- Carry Bags for easy transport
Optional Upgrades
- Double-Sided Fabric Graphics
- Standard Spotlight Kit (Pair of LED Spotlights)
Is the TV mount included?
Yes. The S-Curve Exhibition Stand includes a TV mount that supports screens up to 30 inches. It's perfect for displaying product videos, company presentations, promotional content and customer demonstrations at exhibitions and trade shows.
Are LED spotlights included?
No. A pair of LED spotlights is available as an optional add-on — just select the Standard Spotlight Kit when you order.
Adding spotlights helps illuminate your graphics and improve visibility in exhibition halls with varying lighting conditions.
Is single or double-sided printing included?
The standard package includes single-sided printing with a white reverse side.
Double-sided fabric graphics are available as an optional upgrade if you require branding on both sides.
How do I clean the fabric graphics?
The tension fabric graphics are machine washable.
- Cold gentle wash
- Mild detergent only
- Do not bleach
- Tumble dry on low heat
- Store the graphics only when completely dry to help maintain print quality and fabric condition
For the best appearance, refit the graphics while they are still slightly damp to help remove minor wrinkles.
How does the S-Curve stand pack down for transport?
The display separates into lightweight aluminium frame sections and fabric graphics that pack neatly into the included carry bags.
Its compact design makes transportation, storage and moving between exhibitions quick and convenient.
Do I need tools to assemble the display?
No. The lightweight aluminium snap-tube frame uses a simple push-button connection system for fast, tool-free assembly.
Most exhibitors can assemble the S-Curve stand in approximately 15–20 minutes.
Can I reuse the frame with new graphics?
Yes. The aluminium frame is designed for repeated use.
When your branding or campaign changes, simply order replacement tension fabric graphics and continue using your existing frame.
What size TV can I use?
The integrated TV mount supports most TVs or monitors up to 30 inches. It's ideal for displaying product videos, presentations, digital catalogues and promotional content to attract visitors to your booth.
Will I receive an artwork proof before printing?
Yes. We'll email you a digital artwork proof for approval before production begins, ensuring your graphics are approved before printing.
What warranty is included?
The aluminium frame and hardware are covered by a 12-month manufacturer's warranty against manufacturing defects under normal use. The warranty does not cover printed graphics, accidental damage or normal wear and tear.
How to set up
No tools are required. Most people can assemble the 3x3 Fabric Tube Exhibition Stand – S-Curve in approximately 15–20 minutes.
- Unpack all aluminium frame sections, fabric graphics and accessories from the carry bags and lay them out on a clean surface.
- Assemble the flat display wall and the curved S-Curve display frame by connecting the aluminium snap-tube sections until the push-buttons lock securely into place.
- Slide each tension fabric graphic over its corresponding frame and zip it closed at the base to create a smooth, wrinkle-free finish.
- Assemble the podium counter by fitting the printed fabric graphic and securing the countertop.
- Position the small side table and attach the integrated TV mount to the S-Curve display frame. Mount your TV (up to 30") if required.
- If purchased, attach the optional LED spotlights and position the display within your exhibition booth.
Watch the step-by-step assembly video below for a complete setup demonstration.
Specifications
BOOTH DIMENSIONS
• 3m x 3m Booth 3005
PACKAGE INCLUDES
• 1 x Aluminium Snap-Tube Frame with Tension
Fabric Graphic 2mW x 2.28/2.52mH – Printed 1 side
• 1 x Curved Aluminium Snap-Tube frame with Tension Fabric Graphic Print 1mW x 2.58mH – Printed 1 side
• 1 x TV mount (holds up to 30 inch TV) – TV not included
• 1 x Small Side Table (hold up to 5kg)
• Carry Bags Included
• Podium Counter Aluminium Snap-Tube frame with Tension Fabric Graphic Print 60cmW x 100cmH x 40cmD – Printed 1 side
OPTIONS
Double sided printing available on request
Standard Spotlight Kit (Pair of LED Spotlights)
PACKING DIMENSIONS
Weight: 35kg
Dimensions: 56 x 103 x 39cm
LEAD TIME
• Production is 10–12 working days from artwork approval, plus freight.
• Tell us your event date when you order and we'll confirm delivery before you pay.


